Adjust playback speed for any video. Video speed controller for your videos
Super Video Speed Controller allows to increase or decrease playback speed on any web site.
Features:
🎥 Work almost everywhere
🎥 You can adjust using presets or set a custom speed as a percentage
🎥 Use shortcuts
Quick Start: Find the “Super Video Speed Controller” icon by opening the menu under the “puzzle” icon on the toolbar.
DOWNLOAD NOW
Download and install the extension from the Google Chrome Webstore or Edge Add-ons marketplace
Steps:
Open the video in the active tab. Start playback.
Adjust using the extension’s popup:
The technology works both on large sites and on little-known ones. The coverage of the sites is 99%
You can put it as a percentage and specify the exact value (e.g. +17; -29). Unlike, for example, the Youtube player, where you can put only certain values that are offered to you.
Use the following Keyboard shortcuts:
Super Video Speed Controller for Chrome is available in Chrome Web Store
Super Video Speed Controller for Edge is available in the Edge Add-ons marketplace.
: Detailed boreholes are required to determine skin friction and end bearing. In complex geology like limestone, probe holes at every pile location are recommended to detect cavities. Pile Types
Jacked piling (hydraulic jacking) is a preferred displacement piling method in Singapore for its low noise, zero vibration, and minimal spoil. It is particularly suited for sites adjacent to MRT tunnels, hospitals, and existing buildings. The Geotechnical Engineering Office, Singapore (GEOSS) promotes this practice to standardize installation quality and mitigate risks associated with the Kallang Formation, Old Alluvium, and Bukit Timah Granite. : Detailed boreholes are required to determine skin
: For large pile groups, jacking should proceed from the inside out or in a specific direction (e.g., left to right) to manage ground displacement effectively. "Set" and Termination Criteria : Piles are typically jacked with a force ( Pjcap P sub j ) of 2 to 2.5 times the Working Load (WL) . It is particularly suited for sites adjacent to
For large pile groups, jacking should proceed from the inside out or in a consistent direction (e.g., left to right) to manage ground displacement. "Set" and Termination Criteria : Piles are typically
Research suggests that for piles where the depth is less than 37 times the diameter, the ultimate capacity ( cap P sub u ) may be less than the jacking force ( cap P sub j isomer-user-content.by.gov.sg Protective Measures for Adjacent Structures
: Specialist builders must perform integrity tests (such as PDA or sonic logging) to demonstrate that piles are free of hidden defects.
GeoSS recommends that jacking machines be operated at approximately 75% of their maximum rated capacity to ensure stability and mechanical longevity.